Well my small dealer in Kalamazoo, Michigan finally got an allocation for a Platinum. I've had it on order since 9/1/14 or six months. No big deal, I wasn't in a rush, and frankly the longer we waited maybe many of the technical problems being reported here would be worked out, particularly if I got a late 2015i build.
So now the question, anybody have a feel for how many more weeks to reach "4200 status, ready to ship"?
This is the response I got from the Cadillac Chat line yesterday:
"….I'm afraid it's still too early to give that exact estimate. From here, it should move into the 3000 phases within a couple of weeks, at which point it begins scheduling for production. After that, it usually takes between a few weeks to a little over a month more before it actually produces. Assuming the weather clears up (the nasty weather has caused some issues with our carriers, leading to slight delays), it should ship out soon after that, then shipping will usually be on the lower half of 2-5 weeks. In total, most orders take between 6-12 weeks from when the order is placed to when it arrives at the dealership...."
So now the question, anybody have a feel for how many more weeks to reach "4200 status, ready to ship"?
This is the response I got from the Cadillac Chat line yesterday:
"….I'm afraid it's still too early to give that exact estimate. From here, it should move into the 3000 phases within a couple of weeks, at which point it begins scheduling for production. After that, it usually takes between a few weeks to a little over a month more before it actually produces. Assuming the weather clears up (the nasty weather has caused some issues with our carriers, leading to slight delays), it should ship out soon after that, then shipping will usually be on the lower half of 2-5 weeks. In total, most orders take between 6-12 weeks from when the order is placed to when it arrives at the dealership...."